News Details
CREEC visit
Six visitors from China Railway Eryuan Engineering Group in Switzerland.
The China Railway Eryuan Engineering Group (CREEC) had a four days business visit in Switzerland with systransis AG from Feb 27th to Mar 1st 2012. There were six visitors from CREEC, they are managers and engineers of railway construction department and railway signal department.
The first visit day was a seminar, which was held in systransis AG. During the seminar, the CREEC, ATG and systransis AG shared their ideas of the railway tunnel safety. Specifically, the engineer from ATG introduced the safety solution in Gotthard Base Tunnel, systransis AG explained their optimization ideas and company product applied in the Lötschberg Base Tunnel, while the CREEC made an introduction of the Chengdu-Lanzhou tunnel project in China as the potential cooperation with systransis AG.
On the following two days, systransis AG planned visits to the Lötschberg Base Tunnel and Gotthard Base Tunnel separately for the visitors. In the Lötschberg Base Tunnel visit, it focused on the operation center of BLS and tunnel test track visit. In the Gotthard Base Tunnel, the focus was on the construction site and emergency station visit. On the last day, it was a wonderful travel with the UNESCO world heritage line "Albula", which made the visitors to get more impression of the Switzerland railway.




