News Overview

07.09.2011 Got order for Gotthard project

On August 30th, 2011 the contract for the delivery of the system “Tunnel Automatic Gotthard” for the new, 57 km long Gotthard Base Tunnel has been officially signed with Siemens.


18.05.2011 Foundation of IRSE Swiss Section

On the 5th of May 2011 the IRSE Swiss Sections was founded.

Dr. Markus Montigel was elected president.


05.04.2011 The direct way back home

The journal Junge Wissenschaft published an article, written by Laurin Murer, about the optimized pathfinding functionality implemented for our model railway.


20.01.2011 Systransis Ltd official company for internship of the ETH

Systransis Ltd is official accedited by the ETH as a company for internships for students of the department of Computer Science (D-INFK) of the ETH


20.01.2011 Comprail 2010

12th International Conference on Computer System Design and Operation in the Railway and other Transit Systems


Displaying results 11 to 15 out of 74

< Previous

1

2

3

4

5

6

7

Next >



iso

Swiss TS_ISO

swiss made software

 

© 2013 systransis Ltd